Plugging mechanism and prediction of asphaltene in Bashituo Oilfield
-
摘要: 巴什托油田生产过程中,"堵塞"现象一直伴随着生产存在,严重影响生产及油气开发.分析认为原油内部胶体不稳定,地层及井筒压降是导致沥青质沉淀堵塞井筒的主要原因.通过压力推导预测沥青质析出深度基本分布在500~2 400 m之间,在生产过程中,对该井段着重进行机械除垢,从而达到预防井筒堵塞的目的.Abstract: "Wellbore plugging" phenomenon, which always accompanies the whole production cycle, has seriously affected oil and gas production and reservoir exploitation in the Bashituo Oilfield. Colloid instability of internal oil, formation, and pressure drop are the main reasons for asphaltene precipitation and wellbore plugging. By pressure derivation, the predicted depth of asphaltene precipitation ranges from 500 to 2 400 m. Mechanical descaling focused on these sections during production process can successfully help to achieve the purpose of wellbore plugging prevention.
-
Key words:
- asphaltene /
- plugging depth /
- plugging mechanism /
- Bashituo Oilfield
-
[1] 蒲万芬.油田开发过程中的沥青质沉积[J] .西南石油大学学报,1999,21(4):38-41. [2] 马艳丽,梅海燕,张茂林,等.沥青沉积机理及预防[J] .特种油气藏, 2006, 13(3):94-96. [3] Asomaning S.Test Methods for determining asphaltene stability in crude oils[J].Petroleum Science and Technology,2003,21(3/4):581-590. [4] 赵凤兰,鄢捷年.原油沥青质沉积和吸附引起储层损害的机理及损害程度评价[J].油田化学,2002,19(4):367-370.
计量
- 文章访问数: 634
- HTML全文浏览量: 47
- PDF下载量: 600
- 被引次数: 0