Technical transformation of first station constant pressure water supply system in Tahe Oil Field
-
摘要: 针对塔河油田淡水需求量的不断增加和首站供水系统现状,对塔河油田供水首站恒压供水系统进行技术改造,即对供电电路和控制线路进行改造,改造后实现系统内2台变频器都能分别带动2台供水泵,供水首站的供水保障能力提高了,满足塔河油田生产、生活用水需求。Abstract: In view of the increasing demand for fresh water and the present condition of first station water supply system in the Tahe Oil Field, technical innovation has been made, including the transformation of power supply and control circuits. After the transformation, 2 sets of frequency converter can drive 2 pumps respectively, enhancing the water supply capacity of first station and meeting the production and living water demands in the Tahe Oil Field.
计量
- 文章访问数: 677
- HTML全文浏览量: 72
- PDF下载量: 527
- 被引次数: 0