Gao Jiji, Bai Guoping, Qin Yangzhen, Zhou Zhilong. MONTE CARLO SIMULATION-A CASE STUDY OF MARIB-SHABWA BASIN IN YEMEN[J]. PETROLEUM GEOLOGY & EXPERIMENT, 2010, 32(3): 305-308. doi: 10.11781/sysydz201003305
Citation: Gao Jiji, Bai Guoping, Qin Yangzhen, Zhou Zhilong. MONTE CARLO SIMULATION-A CASE STUDY OF MARIB-SHABWA BASIN IN YEMEN[J]. PETROLEUM GEOLOGY & EXPERIMENT, 2010, 32(3): 305-308. doi: 10.11781/sysydz201003305

MONTE CARLO SIMULATION-A CASE STUDY OF MARIB-SHABWA BASIN IN YEMEN

doi: 10.11781/sysydz201003305
  • Received Date: 2010-01-25
  • Rev Recd Date: 2010-05-07
  • Publish Date: 2010-06-28
  • In the World Petroleum Assessment 2000 project,U.S.Geologic Survey(USGS) adopted the method of probabilistic multiplying,namely Monte Carlo simulation to obtain the forecast for undisco-vered petroleum resources.This method is applied to the resources assessment of the Marib-Shabwa Basin in Yemen,and the results show the undiscovered resources will be 102 million tons of oil equivalents(TOE).In the study area,the syn-rift play is considered to be mature,while the fractured basement play is supposed to be highly promising.

     

  • loading
  • [1]
    USGS.U.S.Geological Survey World Petroleum Assessment2000:Description and results by World Energy Assessment Team[DB].USGS Digital Data Series DDS-60,4 CD-ROM set,2000.
    [2]
    SCHMOKER J W,KLETT T R.U.S.Geological Survey assessment model for undiscovered conventional oil,gas,and NGL resources:The seventh approximation[CD]//U.S.Geological Survey World Petroleum Assessment Team,eds.U.S.Geological Survey World Petroleum Assessment 2000:Geological Survey Digital Data Series DDS-60,4 CD-ROMs,2000.
    [3]
    CHARPENTIER R R,KLETT T R.Monte Carlo simulation model[CD]//U.S.Geological Survey Assessment Methodology Team,eds.U.S.Geological Survey World Petroleum Assessment 2000:U.S.Geological Survey Digital Data Series DDS-60,4 CD-ROMs,2000.
    [4]
    METROPOLIS N,ULAM S.The Monte Carlo Method[J].Journal of the American Statistical Association,1949,44(247):335-341.
    [5]
    JOEY MECHELLE DAWES.EC Approves Project Methodology[J].AAPG Explorer,1999 May Issue.
    [6]
    周总瑛,白森舒,何宏.成因法与统计法油气资源评价对比分析[J].石油实验地质,2005,27(1):67-73.
    [7]
    KLETT T R,CHARPENTIER R R,SCHMOKER J W.Assessment operational procedures[CD]//U.S.Geological Survey World Petroleum Assessment Team,eds.U.S.Geological Survey World Petroleum Assessment 2000:U.S.Geological Survey Digital Data Series DDS-60,4 CD-ROMs,2000.
    [8]
    AHLBRANDT T S,CARPENTIER R R,KLETT T R.et al.Global Resources Estimates from Total Petroleum Systems,AAPG Memoir 86[M].Tulsa:AAPG,2005:1-323.
    [9]
    AHLBRANDT THOMAS S.Chapter Introduction[CD]//U.S.Geological Survey Assessment Methodology Team,eds.U.S.Geological Survey World Petroleum Assessment2000:U.S.Geological Survey Digital Data Series DDS-60,4 CD-ROMs,2000.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (1868) PDF downloads(1092) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return