Pan Lijuan, Liu Biao. Feasibility assessment of safe application of turbine drill in block Mai 1[J]. PETROLEUM GEOLOGY & EXPERIMENT, 2013, 35(S1): 133-136. doi: 10.11781/sysydz2013S1133
Citation: Pan Lijuan, Liu Biao. Feasibility assessment of safe application of turbine drill in block Mai 1[J]. PETROLEUM GEOLOGY & EXPERIMENT, 2013, 35(S1): 133-136. doi: 10.11781/sysydz2013S1133

Feasibility assessment of safe application of turbine drill in block Mai 1

doi: 10.11781/sysydz2013S1133
  • Publish Date: 2013-10-28
  • The technique of turbine drill has been planned to apply in block Mai 1 in order to improve production efficiency; however, due to the low ROP in igneous rocks in the Kaipaizileik Formation, collapse may happen in some wells and cause drilling stuck. So it is necessary to carry out a feasibility assessment. Through the analysis of igneous rock size, falling collapse time and log data, the debris falling collapse cycle, size and quantity proportion have been realized and the falling well section has been defined. According to the request of well bore structure of block Mai 1, from the viewpoints of optimizing assembly and carrying rock, we analyze how to use 139. 7 mm drill pipe under the condition of pump pressure to allow and reduce circulating pressure loss, improve annular return velocity, determine debris falling security to carry out the limit of well depth and pump rate, and finally reduce the risk of drilling stuck. The purpose of using turbine drill in igneous rock formation drilling safely and quickly has been achieved.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (521) PDF downloads(508) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return