Volume 44 Issue 6
Nov.  2022
Turn off MathJax
Article Contents
LIU Zengqin, LÜ Rui. Play risk evaluation for hydrocarbon exploration[J]. PETROLEUM GEOLOGY & EXPERIMENT, 2022, 44(6): 1081-1087. doi: 10.11781/sysydz2022061081
Citation: LIU Zengqin, LÜ Rui. Play risk evaluation for hydrocarbon exploration[J]. PETROLEUM GEOLOGY & EXPERIMENT, 2022, 44(6): 1081-1087. doi: 10.11781/sysydz2022061081

Play risk evaluation for hydrocarbon exploration

doi: 10.11781/sysydz2022061081
  • Received Date: 2021-08-16
  • Rev Recd Date: 2022-10-12
  • Publish Date: 2022-11-28
  • Risk and uncertainty are coherent attributes in hydrocarbon play exploration, and comprehensive exploration strategy requires a deliberate consideration of risk aversion and an faithful understanding of uncertainty. According to the characteristics of SINOPEC oversea oil and gas exploration projects, as well as the exploration project evaluation criteria of international oil companies, this paper describes the establishment of value-determined standards and hydrocarbon play risk workflow by quantitative assessment of hydrocarbon generation and charge capability, reservoir quality, preservation condition, and trap validity of a play. According to data density, coverage and geological understanding, in accordance with bucket theory, the probabilities of occurrence of four risk factors were determined, and the chance of geologic success (COGS) of a play was obtained by multiplying the probabilities of each risk factor. This workflow provided a method for transferring qualitative geological understanding and exploration data to quantitatively assess the risk probability of each factors and overall COGS. The COGS values determine the play risk, which is a comprehensive reflection of the exploration phase and geological characteristics of the study block. The play risk workflow facilitates high grading areas, allows a focus on the exploratory and appraisal aspects, and provides a scientific basis for exploration investment decision.

     

  • loading
  • [1]
    BP. Statistical Review of world energy 2020[EB/OL]. [2020-06-12]. https://www.bp.com/content/dam/bp/business-sites/en/global/corporate/pdfs/energy-economics/statistical-review/bp-stats-review-2020-full-report.pdf.
    [2]
    刘朝全, 姜学锋. 2019年国内外油气行业发展报告[M]. 北京: 石油工业出版社, 2020.

    LIU Chaoquan, ZHANG Xuefeng. 2019 domestic and international oil and gas industry development report[M]. Beijing: Petroleum Industry Press, 2020.
    [3]
    王俊玲, 史丹妮, 刘志强, 等. 海外在实施油气勘探项目地质风险评价方法探讨[J]. 中国石油勘探, 2010, 15(3): 67-72. https://www.cnki.com.cn/Article/CJFDTOTAL-KTSY201003015.htm

    WANG Junling, SHI Danni, LIU Zhiqiang, et al. Discussion on method for geological risk assessment of oversea hydrocarbon exploration projects[J]. China Petroleum Exploration, 2010, 15(3): 67-72. https://www.cnki.com.cn/Article/CJFDTOTAL-KTSY201003015.htm
    [4]
    赵华, 王斌, 陈家杰, 等. 利用蒙特卡洛方法评估多个勘探圈闭的策略[J]. 中国石油勘探, 2019, 24(3): 331-340. https://www.cnki.com.cn/Article/CJFDTOTAL-KTSY201903006.htm

    ZHAO Hua, WANG Bin, CHEN Jiajie, et al. Strategies of assessing multiple exploration traps by means of Monte Carlo method[J]. China Petroleum Exploration, 2019, 24(3): 331-340. https://www.cnki.com.cn/Article/CJFDTOTAL-KTSY201903006.htm
    [5]
    李鹭光, 何海清, 范土芝, 等. 中国石油油气勘探进展与上游业务发展战略[J]. 中国石油勘探, 2020, 25(1): 1-10. https://www.cnki.com.cn/Article/CJFDTOTAL-KTSY202001001.htm

    LI Luguang, HE Haiqing, FAN Tuzhi, et al. Oil and gas exploration progress and upstream development strategy of CNPC[J]. China Petroleum Exploration, 2020, 25(1): 1-10. https://www.cnki.com.cn/Article/CJFDTOTAL-KTSY202001001.htm
    [6]
    胡素云, 李建忠, 王铜山, 等. 中国石油油气资源潜力分析与勘探选区思考[J]. 石油实验地质, 2020, 42(5): 813-823. doi: 10.11781/sysydz202005813

    HU Suyun, LI Jianzhong, WANG Tongshan, et al. CNPC oil and gas resource potential and exploration target selection[J]. Petroleum Geology & Experiment, 2020, 42(5): 813-823. doi: 10.11781/sysydz202005813
    [7]
    陆亚秋, 王进, 曹梦茜. 基于改进的层次分析法的页岩气开发选区评价方法[J]. 油气藏评价与开发, 2021, 11(2): 204-211. https://www.cnki.com.cn/Article/CJFDTOTAL-KTDQ202102009.htm

    LU Yaqiu, WANG Jin, CAO Mengxi. Evaluation method of shale gas development area selection based on improved analytic hierarchy process[J]. Reservoir Evaluation and Development, 2021, 11(2): 204-211. https://www.cnki.com.cn/Article/CJFDTOTAL-KTDQ202102009.htm
    [8]
    ROSE P R. Risk analysis of prospects vs. plays: The play's the thing![J]. AAPG Bulletin, 1996, 80(9): 479.
    [9]
    ROSE P R. Dealing with risk and uncertainty in exploration: how can we improve?[J]. AAPG Bulletin, 1987, 71(1): 1-16.
    [10]
    FUGELLI E M G, OLSEN T R. Risk assessment and play fairway analysis in frontier basins: part 2—examples from offshore mid-Norway[J]. AAPG Bulletin, 2005, 89(7): 883-896.
    [11]
    RUDOLPH K W, GOULDING F J. Benchmarking exploration predictions and performance using 20+ yr of drilling results: one company's experience[J]. AAPG Bulletin, 2017, 101(2): 161-176.
    [12]
    肖玉茹, 黄学斌, 李姝, 等. 基于量化不确定性的储量升级动用潜力评价方法[J]. 石油实验地质, 2021, 43(1): 169-175. doi: 10.11781/sysydz202101169

    XIAO Yuru, HUANG Xuebin, LI Shu, et al. A method for evalua-ting the potential of reserve upgrading based on quantitative uncertainty[J]. Petroleum Geology & Experiment, 2021, 43(1): 169-175. doi: 10.11781/sysydz202101169
    [13]
    李军. 致密油藏储量升级潜力不确定性评价方法及应用[J]. 石油与天然气地质, 2021, 42(3): 755-764. https://www.cnki.com.cn/Article/CJFDTOTAL-SYYT202103021.htm

    LI Jun. Non-deterministic method for tight oil reserves upgrade potential assessment and its application[J]. Oil & Gas Geology, 2021, 42(3): 755-764. https://www.cnki.com.cn/Article/CJFDTOTAL-SYYT202103021.htm
    [14]
    吕睿. 不确定分析法快速估算资源量实现步骤及关键[J]. 西安石油大学学报(自然科学版), 2018, 33(1): 47-53. https://www.cnki.com.cn/Article/CJFDTOTAL-XASY201801008.htm

    LV Rui. Key steps of rapid estimation of resource quantity by uncertainty analysis[J]. Journal of Xi'an Shiyou University (Natural Science Edition), 2018, 33(1): 47-53. https://www.cnki.com.cn/Article/CJFDTOTAL-XASY201801008.htm
    [15]
    MAGOON L B. Petroleum system: a classification scheme for research, resource assessment, and exploration[C]//American Association of Petroleum Geologists Annual Meeting. Los Angeles: Geological Survey, 1987.
    [16]
    WHITE D A. Selecting and assessing plays: chapter 8: part Ⅱ. Nature of the business[J]. AAPG Special Volumes, 1992, 12(8): 87-94.
    [17]
    WHITE D A. Geologie risking guide for prospects and plays[J]. AAPG Bulletin, 1993, 77(12): 2048-2061.
    [18]
    MAGOON L B, DOW W G. The petroleum system: from source to trap, AAPG memoir 60[M]. Tulsa: AAPG, 1994.
    [19]
    郭秋麟, 米石云. 油气勘探目标评价与决策分析[M]. 北京: 石油工业出版社, 2004.

    GUO Qiulin, MI Shiyun. Assesment of petroleum exploration target and exploration decisions[M]. Beijing: Petroleum Industry Press, 2004.
    [20]
    OTIS R M, SCHNEIDERMANN N. A process for evaluating exploration prospects[J]. AAPG Bulletin, 1997, 81(7): 1087-1109.
    [21]
    匡建超. 基于区带—远景圈闭组合的油气勘探地质风险评价方法[J]. 天然气工业, 2007, 27(11): 121-124. https://www.cnki.com.cn/Article/CJFDTOTAL-TRQG200711041.htm

    KUANG Jianchao. Geological risk assessment method of oil and gas exploration on zone and prospective trap combination[J]. Natural Gas Industry, 2007, 27(11): 121-124. https://www.cnki.com.cn/Article/CJFDTOTAL-TRQG200711041.htm
    [22]
    闫相宾, 刘超英, 蔡利学. 含油气区带评价方法探讨[J]. 石油与天然气地质, 2010, 31(6): 857-864. https://www.cnki.com.cn/Article/CJFDTOTAL-SYYT201006023.htm

    YAN Xiangbin, LIU Chaoying, CAI Lixue. A discussion on methods of play assessment[J]. Oil & Gas Geology, 2010, 31(6): 857-864. https://www.cnki.com.cn/Article/CJFDTOTAL-SYYT201006023.htm
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(9)  / Tables(1)

    Article Metrics

    Article views (1606) PDF downloads(83) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return