Liu Lian, Wang Chao, Zou Wei, Tang Yong, Meng Li, Fan Lingyun, Liu Bing. Improvment and application of pressure measuring technique in coiled tubing[J]. PETROLEUM GEOLOGY & EXPERIMENT, 2011, 33(S1): 165-166. doi: 10.11781/sysydz2011S1165
Citation: Liu Lian, Wang Chao, Zou Wei, Tang Yong, Meng Li, Fan Lingyun, Liu Bing. Improvment and application of pressure measuring technique in coiled tubing[J]. PETROLEUM GEOLOGY & EXPERIMENT, 2011, 33(S1): 165-166. doi: 10.11781/sysydz2011S1165

Improvment and application of pressure measuring technique in coiled tubing

doi: 10.11781/sysydz2011S1165
  • Received Date: 2010-12-20
  • Rev Recd Date: 2011-02-21
  • Publish Date: 2011-12-30
  • Well BK9 is a development well located in the outer blocks of the Tahe Oil Field.gas pumping to drive oil flow in coiled tubing,liquid supply is not enough.Manometer is Whenused touslngmea5ureliquid surface restoration speed so as to guide latter gas pumping.The well is far away from the oilfield base,the regionSO It COStSis high(1.moretime and money to arrange well test.Meanwhile,the pressure coefficient of97 for formation pressure coefficient),resulting in big risks for well controls.Through techniqueelectric manometerInnovationa dynamic pressure measuring technique combining coiled tubing andis proposed.The detected liquid depth correction formula is put forward.

     

  • loading
  • [1]
    程东风,吕静,朱邦辉.应用液面数据提高井底压力折算的精度[J].内蒙古石油化工,2010(8):71-72.
    [2]
    王海涛,李相方.连续油管技术在井下作业中的应用现状及思考[J].石油钻采工艺,2008,30(6):120-124.
    [3]
    张燕娜,石凯.连续油管的应用与发展[J].西部探矿工程,2010(1):93-94,98.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (499) PDF downloads(397) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return